More and more Chattanooga buyers are purchasing an older house for the lot, with the plan to take it down and build new. It is a sound plan in neighborhoods like Red Bank, Signal Mountain, Lookout Valley and the North Shore, where the land is worth more than what is standing on it. The part that trips people up is the sequence. Demolition has to happen in the right order, or the new build is delayed before the first footing is poured.
If you are still under contract, use the inspection period to answer the practical questions. Is there a basement or a pool? Are there large trees close to the structure? Is the driveway narrow or the lot steep? Is it an older house that likely contains asbestos? Every one of those changes the scope and the schedule. We are happy to walk a property with you and give you a written scope so that your offer reflects the true cost of clearing the lot. Our demolition cost guide explains what drives the price.
For a demolition, an asbestos survey is not a suggestion. Older houses commonly have regulated materials in flooring, ceiling texture, siding, roofing, pipe wrap and duct work. They have to be identified, and anything that is confirmed has to be handled properly before the structure comes down. This is a step people skip in their planning and then discover when a permit office asks for it. Read our page on the asbestos survey before demolition so you know what to expect.
Gas, electric, water and sewer all have to be properly disconnected, and each provider has its own process and its own lead time. Sewer and water connections are often capped at the street or the property line. Start these early because they are the usual cause of a late start. Then there is the demolition permit itself, which has its own requirements. Our guide to demolition permits in Chattanooga covers what the city and county typically want to see. Do not take a contractor's word that "the permit is handled" without seeing it.
With the survey done, utilities off and permit in hand, the actual work moves quickly. A typical house demolition takes a few days for a standard structure, followed by hauling debris, removing foundation and slab, and dealing with anything underground such as a septic tank, an old cistern or a buried fuel tank. Those last items are the ones that surprise people, so ask about them upfront.
This is what separates a good demolition from a cheap one. Your builder needs a lot that is graded, clear of stumps and rubble, free of voids that need to be filled and compacted, with an entrance that can take concrete trucks. Our site clearing work covers trees, brush, grading and haul off so that the builder can mobilize right away. Coordinate with your builder and your surveyor so that the lot is left exactly as they need it.
Before closing: walk the lot, get a written scope, ask about underground items.
After closing: order the asbestos survey and start the utility disconnects the same week.
Before demolition day: confirm the permit, notices and neighbor access.
After demolition: confirm grading and debris removal match what your builder expects.
Call (423) 497-3783 with the address and your timeline. We will walk the lot and give you a written plan in the right order.
Free site visits · Fixed written bids · Permits and haul-off handled